To undertake the construction of a 0.940km paved road with 60mm interlocking paving, Fig 8b Kerbs and edge beams. 180m paved stormwater channel and 132m of stormwater culvert that has a 600m diameter concrete pipe at Rasimone village located in North region.
This project will be executed in collaboration with civil engineering consultants and the appointed contractor. The project timeline is expected to span from 10 October 2023 to 04 March 2024, with an estimated duration of five months.
RBN Infraco department will monitor the project through means of receiving and analysing progress reports and attending site meetings throughout the duration of the project that will come to conclusion.
Project Milestones:
Site establishment;
Relocation and protection of existing services;
Conformance to road design layerworks;
Quality assurance by testing and approval of the road levels;