To undertake the construction of a 4.551km asphalt road which comprises of 4m wide stormwater channel, speed humps, road markings, signage, relocation of fence and existing electrical poles, concrete splash drains, side drains at Mafenya/Chaneng located in the North region.
This project will be executed in collaboration with civil engineering consultants and the appointed contractor. The project timeline is expected to span from 18 October 2023 to 11 June 2024, with an estimated duration of eight months.
RBN Infraco department will monitor the project through means of receiving and analysing progress reports and attending site meetings throughout the duration of the project that will come to conclusion.
Project Milestones:
Site establishment;
Relocation and protection of existing services;
Conformance to road design layerworks;
Quality assurance by testing and approval of the road levels;